Transportation of oversized vessels

DDG dryer for Nowra Ethanol Plant

ethanol production
Low bridge hazard during transportation
ethanol production
Backing onto site
ethanol production
Trucks backed into place
ethanol production
Offloading the dryers
ethanol production
Dryers onsite at Nowra
ethanol production
One down, one to go onsite at Nowra
Transportation job of large vessels from the docks to the site in Nowra. This project required coordination between the transport companies, traffic authorities and site personnel. Site access for other users during unloading, ground conditions and the location of the temporary storage area all had to be considered to minimize future lifting operations and disruption of other jobs onsite.